•
How do the proposed test adequacy criteria
compare with the traditional criteria?
Traditional Criteria
Proposed Criteria
Seeded
Errors
Test set T
1
adequate
w.r.t. block, decision,
c-use and p-use.
Errors revealed = E
2
Errors revealed = E
1
Hypothesis: E
1
= E
2